We have a maximum late charge of $500 set up on our software system for all loans. Sometimes if we were to charge 5% of the late payment, the late charge would be greater than this. Are we required to state on our loan documents that the maximum is $500 in addition to the $6.24 or 5% of the late payment verbage?