The Flood Determination Form, Box B1 and B2 contain the Map Number and Map Panel Effective/Revised Date of the Flood Map that was used to make the determination for a particular loan.
In my specific example, the map panel date on the flood determination is 8-23-2001. When you go to the Community Status Book for that state, the map date is 7-3-2012. (I did verify that both the flood determination and the Community Status Book were published after the map changes.)
My question: A Flood Map has a date. All the Flood Panels within that Map have a revision date. In theory, only a few panels in a map might change during a FEMA revision. Do the panels that are not changed retain their last revision date?
_________________________
"No problem can withstand the assault of sustained thinking." ~ Voltaire
"Sustained thinking gives me a headache." ~Me